Construction on our Holcombe House began in June, 2017!
Check back often for construction updates and watch our progress live via webcam below thanks to W.S. Bellows Construction Corporation.
[one_third]
Phase I
This phase of the project includes construction of a new two-story tower that connects to the existing House through skywalks on the second and third levels. It will provide 20 new bedrooms, increasing our capacity by 40%.
[/one_third]
[two_third last=last]
[metaslider id=6139]
[/two_third]
[one_third]
Phase II
This phase of the project substantially upgrade existing common areas on the first floor, including our high-use kitchen, with durable materials and equipment that will withstand years of use by thousands of families. Additionally, the family intake area will be reconfigure to provide private and quiet spaces for families.
[/one_third]
[two_third last=last]
[metaslider id=6163]
[/two_third]